Real Results

Solar Installation Case Studies

A selection of residential, commercial, and condominium solar projects across Singapore. Real systems, real savings, real feedback.

2,000+
Installations Completed
40 MW+
Total Capacity Installed
20–40%
Typical Bill Savings
5–8
Year Payback Period

Real Installations

Aerial shots from recent rooftop solar projects across Singapore — every system designed, installed, and commissioned by our in-house team.

Aerial view of rooftop solar panels on a landed home in Singapore
Solar panels installed on a terracotta tile roof of a Singapore landed property
Top-down drone view of a Singapore courtyard house with rooftop solar installation
Rooftop solar array on a landed home along a residential street in Singapore
Large rooftop solar panel array on a Singapore landed home, aerial drone view
Multi-roof solar panel installation on a residential building in Singapore
Landed HomeReal Project
Kovan

12 kW Landed Home Solar System

System
12 kW
30 x Tier 1 panels
Payback
~4.5 yrs
Tier 1 inverter + balcony shelters
Monthly savings: S$350/month
Bill before: ~S$600/month Bill after: S$247.94 (Aug 2026)
10.79 MWh
Produced in 2026
17.89 MWh
Lifetime production
S$3.19k
Earned in 2026 (Jan–Sep)
Landed HomeReal Project
Ang Mo Kio

10 kW Landed Home Solar System

System
10 kW
25 x Tier 1 panels
Payback
~3.5 yrs
Tier 1 inverter
Monthly savings: S$220/month
Bill before: ~S$500/month Bill after: ~S$280/month
Landed HomeReal Project
Bukit Timah

8.5 kW Terrace House Solar System

System
8.5 kW
22 x Tier 1 panels
Payback
6.2 years
SolarEdge inverter
Monthly savings: S$325/month
Bill before: ~S$420/month Bill after: ~S$95/month
The team handled everything from the MCST paperwork to the final commissioning. Our bills dropped by almost 80% during peak months.
Homeowner, Bukit Timah
CondominiumReal Project
Marina Bay area

MCST Rooftop Solar System

System
45 kW
120 x Tier 1 panels
Payback
5.5 years
Sungrow inverters
Monthly savings: S$1,700/month
Bill before: ~S$4,800/month common area Bill after: ~S$3,100/month common area
The MCST proposal was clear and the residents approved it quickly. We're already seeing lower maintenance fund calls.
MCST Chairperson
Commercial WarehouseReal Project
Jurong

180 kW Industrial Rooftop Solar

System
180 kW
450 x Tier 1 panels
Payback
4.8 years
Huawei inverters
Monthly savings: S$6,500/month
Bill before: ~S$18,000/month Bill after: ~S$11,500/month
Installation was done over a weekend so there was no disruption to our operations. The ROI case made this an easy decision.
Operations Director, Jurong
Landed HomeReal Project
Serangoon

12 kW Semi-Detached Solar System

System
12 kW
30 x Tier 1 panels
Payback
5.8 years
SMA inverter
Monthly savings: S$500/month
Bill before: ~S$680/month Bill after: ~S$180/month
We wanted to future-proof our home against rising tariffs. The monitoring app lets us see exactly what we're producing.
Homeowner, Serangoon
Retail BuildingReal Project
Tampines

60 kW Retail Solar System

System
60 kW
150 x Tier 1 panels
Payback
5.1 years
Sungrow inverters
Monthly savings: S$2,200/month
Bill before: ~S$6,200/month Bill after: ~S$4,000/month
Our sustainability report now includes real solar generation data. Customers have noticed our green commitment too.
Retail Manager, Tampines

Add Your Project to This List

Get a free consultation and see how much your property could save with Argyle Solar.